IKEA OCP ALHOUFUF
Stage: Built Year: 2017 Built up Area: 3,475 sqm Construction Cost: 18,798,145 SAR The IKEA Order and…
Stage: Built Year: 2017 Built up Area: 3,475 sqm Construction Cost: 18,798,145 SAR The IKEA Order and…
Stage: Built
Year: 2017
Built up Area: 3,475 sqm
Construction Cost: 18,798,145 SAR
The IKEA Order and Collection Point “OCP” in AlHoufuf, operational since 2017, offers a streamlined version of the IKEA experience, with the same great range and inspiration, with most products available to order and collect.
EHTERAF@2024