IKEA OCP ALHOUFUF

Stage: Built Year: 2017 Built up Area: 3,475 sqm Construction Cost: 18,798,145 SAR The IKEA Order and…

IKEA OCP ALHOUFUF

Stage: Built

Year: 2017

Built up Area: 3,475 sqm

Construction Cost: 18,798,145 SAR

The IKEA Order and Collection Point “OCP” in AlHoufuf, operational since 2017, offers a streamlined version of the IKEA experience, with the same great range and inspiration, with most products available to order and collect.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *